Front-Load Dumpster Floor Replacement — Start to Finish
The most common job in the shop. When a front-load can’s floor rusts through, we cut the old floor out, fit a new steel plate, and weld it in so the can goes back on the route for years — not weeks.
BeforeRusted floor cut out of the canDuringNew steel plate fitted and welded inAfterSolid new floor — ready for paint
IN THE DOOR → OUT THE DOOR
What a Front-Load Can Looks Like Coming In — and Going Out
Rusted-through walls, blown-out corners, dead hinges. We cut out the rot, weld in new steel, then repaint and re-decal so it looks like it just left the factory.
Coming inRusted through the side wallOn the benchCutting out the rot before new steel goes inGoing outRepaired, repainted, back on the route
MORE FROM THE SHOP
Roll-Offs, Front-Loads, Fabrication & the Yard
Refurbished 40-yd roll-offNew floor in a roll-offRoll-off floor replacementCutting new floor plateSteel plate stock, ready to goRusted floor, beforeTorch work on a damaged canInside the shopRefurbished cans, lined upReady for deliveryThe shop, 4240 SE 95th StWelding inside a roll-offFloor panel installRoll-off floor repairFront-loads in for repair
Ready to Get Your Equipment Back in Service?
Drop off at our Ocala shop or call for a quote. Most jobs turned around fast.